Risk Analysis & Project Management of a Railway Bridge Project Using Primavera P6
Keywords:
Primavera, Project Management, Scheduling, Resources, BridgeAbstract
Usage of development venture needs an appropriate arranging and planning is of fundamental significance for the task to be executed and run easily. A best timetable must be set up so that meets the essential targets of the aggregate venture. Those essential destinations are to make a quality undertaking, finished on time, inside spending plan, and in a sheltered workplace. Consequently, in this examination a progressing development venture is taken and the execution of the undertaking is contrasted and the timetable with the assistance of Primavera P6. A progressing venture in Narmada crossing extension of third line between Budhni and Hoshangabad on Bhopal Itarsi Section is chosen and the exercises relating to the preconstruction, substructure and superstructure is considered for correlation. From the examination, it is discovered, how the task is arranged, the succession of work and connecting connections between exercises for the entire venture. In end it is comprehended that, it is vital to understand that there will be changes to the timetable rationale and contrasts between the arranged advancement and genuine advancement. In light of the distinctions the timetable should be changed to finish the undertaking easily.
Downloads
References
Prof. A. Ray Chaudhuri, B. Sivakonda Reddy, Prof. A. Ray Chaudhuri, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2012 PN (660 – 665)
Indrasen Singh, P. Venkateswaralu, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102)
Antony Prasanath MA, Thirumalai Raja K, “Analysis of cost & schedule Performance of Residential Building Projects by EVM technique”, Journal of Construction Engineering, Technology and Management ISSN: 2347- 7253, Vol. 4, (2014) PN (1-7)
Tarek Hegazy, Wail Menesi, “Critical Path Segments Scheduling Technique” Journal of Construction Engineering and Management ASCE/ (Oct 2010) PN (1078-1085)
Awad Hanna, Aviad Shapira, Mounir Asmar and Craig Taylor, “Impact of crew scheduling on project performance”, Practice Periodical on Structural Design and Construction ASCE (2013) PN (35 – 44)
Robert B. Harris, “Packing method for Resource Levelling”, Journal of Construction Engineering and Management © ASCE, vol no 116, June 1990 PN (331 – 350)
Khaled El-Rayes and Dho Heon – “Optimizing Resource Leveling in Construction Projects”, Journal of Construction Engineering and Management © ASCE, Vol. 135, No. 11, November 1, 2009. PN (1172 - 1180)