Planning and Scheduling of G+12 Building using Primavera P6

Authors

  • Saboor Ahmed Department of Civil Engineering, Millennium Institute of Technology, Bhopal, Madhya Pradesh, India Author
  • Afzal Khan Department of Civil Engineering, Millennium Institute of Technology, Bhopal, Madhya Pradesh, India Author

Keywords:

Scheduling, Allocation, Management, Construction, Resources

Abstract

Utilization of Project management in construction industry is now a days considered as a big skill to remote the allocation of resources and scheduling of the entire project. For such management activities various tools like primavera and MSP are in trend. People utilizes these tools to carry out an estimate scheduling for the entire project before starting. This helps out in making project run smooth and without any delay.
In this study we are utilizing primavera P6 software in a G+12 building project to justify the positive remarks of such scheduling. In this project we are considering data from site work.
              

Downloads

Download data is not yet available.

References

K. Suresh Kannan and M. G. Ranjith Kumar, [Planning and Scheduling Residential Building Using Primavera Software], Journal of Transportation Systems Volume 4 Issue 1, 2019.

Pravin Namdev Pharne, Nagesh Rajshekhar Wagdare, Nilesh Pratap Limbone and Jivan Dinkar Gaikwad, [Project Management Using Primavera P6], International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653, Volume 10 Issue V May 2022.

Dhinesh.M, Kaleeswaran.S, and Ashok Manikandan.S, [Planning,Scheduling and Tracking of Residential Building Using Project Management Software], SSRG International Journal of Civil Engineering- (ICRTCETM-2017) - Special Issue – April 2017.

Mohammed ZakiHaider, Rajendra.S and Vijay.K, [PLANNING SCHEDULING, TRACKING AND APPLICATION ADMINISTRATION USING PRIMAVERA WEB LOGIC P6], International Journal of Research in Engineering and Technology, Volume: 05 Issue: 07 | Jul-2016.

Shahnawaz Naseem, Akash Agrawal and Naresh Harry, [Project Planning, Scheduling, Tracking and Cost Control – A Case Study for Residential (G+4) Building by Using Software Primavera P6], International Journal of Research in Advent Technology, Vol.6, No.7, July 2018.

Meghana Kadiyala, S B Tharunika and Ramesh Kannan M, [Planning and Scheduling of a Multi-Storey Building using Primavera P6], International Research Journal of Engineering and Technology (IRJET), Volume: 07 Issue: 11 | Nov 2020.

Veerabhadragouda P Patil, Sushma R K, Bikesh Bhattarai, Mukesh Kumar, Chandra Bhusan Mahato and Md Imran Ansari, [Planning and Scheduling of College Building by using Primavera P6], International Journal of Engineering Research & Technology (IJERT) ISSN: 2278-0181, 2022.

Harshali Pawar, Ritali Wagh, Shrutika Shahane, Maya Kakad, Vaishnavi Kakad and S. S. Bodke, [Planning and Scheduling of High Rise Building Using Primavera], Int J S Res Sci. Engg. Tech. 2018 Mar-Apr;4(4) : 533-537.

P Raghunath Reddy and B.Harish Naik, [Planning and Resource Scheduling of Residendial (G+7) Project Using Primavera], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 5, Issue 10, October 2016.

Published

11-07-2023

Issue

Section

Research Articles

How to Cite

Ahmeda, Mahmood.A. Hmood, S. ., & Khan, A. (2023). Planning and Scheduling of G+12 Building using Primavera P6. International Journal of Scientific Research in Civil Engineering, 7(4), 22-39. https://ijsrce.com/index.php/home/article/view/IJSRCE23745

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

1-10 of 273

You may also start an advanced similarity search for this article.