Planning, Scheduling and Resource Allocation of a Nh-344 Using Primavera P6

Authors

  • Manmeet Anand P.G. Scholar, Department of Civil Engineering, Millennium Institute of Technology, Bhopal Madhya Pradesh, India Author
  • Afzal Khan Assistant Professor, Department of Civil Engineering, Millennium Institute of Technology, Bhopal Madhya Pradesh, India Author

Keywords:

Earned Value Analysis, Primavera P6, Project Management, Road Work, Cost, Time, EVA Parameters, Resources, Scheduling

Abstract

Transportation is one of biggest basic need for the society. The construction of road gives the better transportation facility around the country. For better development of the country in the construction assertive, the project management is necessary. Time and Cost are the two basic parameters to control work in the execution of the road construction. Flow of cost and its usage is very important aspect for beneficial point of view. It is necessary to develop the planning software to easy the works and risks arises in the projects. For the cost analysis of the road works, EVA technique is used to overcome the problems raised during execution. To understand the cost values in the road construction projects, Earned value analysis of any construction industry which gives the warning messages to the planning process as well as during the execution of the project whether the project is going on time and it is under budget or over budget. Primavera P6 software gives the accurate Earned value results. 
The undertaken project was “Development of 6-lane Urban Extension Road (UER) – 2 - NH-344 M. Package -1 (From NH1 to Karala – Kanjhawala road, Km -0+700 to 15+000) in the state of Delhi on EPC mode” where the planning and scheduling is performed using Primavera P6 to presents its utility for resource allocation and cost optimization.
              

Downloads

Download data is not yet available.

References

R.Santhosh Kumar and Anoop James Antony, [Experimental Investigation on Pre Planning of Road Construction by Using Primavera], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 7, Issue 5, May 2018.

Gunjal Kartikeyan, Rohit Gholap, Ranjeet Katkar, Prasad Khune and Pooja Bhosale, [TO STUDY ADVANCED PROJECT PLANNING AND SCHEDULING-CASE STUDY], INTERNATIONAL JOURNAL OF ADVANCE SCIENTIFIC RESEARCH & ENGINEERING TRENDS, || Volume 5 || Issue 12 || April 2021.

Maheshwar S Maregoudru, Monish Kumar K, Ashwija K C and Sparsha B P, [Cost Analysis of Road Construction Project by Earned Value Analysis using Primavera P6], International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 07 | July -2017.

Pravin Namdev Pharne, Nagesh Rajshekhar Wagdare, Nilesh Pratap Limbone, Jivan Dinkar Gaikwad, [Project Management Using Primavera P6], International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653, Volume 10 Issue V May 2022.

T.Subramani and M.Sekar, [Preplanning And Scheduling Of Road Construction By Using PPM], International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 4, Issue 5, May 2015 ISSN 2319 - 4847.

T.Subramani and Kurian Jacob, [Analysis of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software], International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 5, Issue 3, May-June 2016 ISSN 2278-6856.

Sushma.H, Bhavya.S, Rajeeva S.J and G. Narayan, [Planning, Scheduling and Resource Optimization for Road Construction Using Primavera], INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY, August 2017 | IJIRT | Volume 4 Issue 3 | ISSN: 2349-6002.

Lalitesh Sinha and Atul Tripathi, [Cost and Time Optimization of Highway (NH 24-B, Phase-I) Construction], Volume 4, Issue 7, July – 2019 International Journal of Innovative Science and Research Technology ISSN No:-2456-2165.

Downloads

Published

05-03-2023

Issue

Section

Research Articles

How to Cite

Anand, M., & Khan, A. (2023). Planning, Scheduling and Resource Allocation of a Nh-344 Using Primavera P6 . International Journal of Scientific Research in Civil Engineering, 7(2), 24-32. https://ijsrce.com/index.php/home/article/view/IJSRCE23724

Most read articles by the same author(s)

1 2 > >> 

Similar Articles

1-10 of 432

You may also start an advanced similarity search for this article.