Utilization of management tool Microsoft project in construction Industry : A Review
Keywords:
Project Management, Microsoft Project, Review, Scheduling, Civil IndustryAbstract
Project management incorporates the way toward arranging, organizing, overseeing assets and methods to accomplish the hierarchical objectives. Objectives are set and accomplished in the project management and it's tied in with handling and controlling. Project management is about the arranging and controlling how the hierarchical objectives are met. Much the same as the business administrators who oversee a particular business zone, project supervisors administer the general project allotted to them and control cost and generation matters inside enterprises. Microsoft project is an easy and simple management tool which provide fast and specific procedure for management and scheduling of a project. Civil industry utilizes such tools for proper and easy management of various project. Programming building is worried about the improvement and headway of immense and different programming serious frameworks. It covers hypotheses, techniques and devices for the particular, engineering, structure, testing, and support of programming frameworks. The present improvement of programming frameworks are altogether huge, intricate and basic, that just through the utilization of computerized methodologies can such frameworks be created and advance in a monetary and opportune way.
In this paper we are providing review of research done in past related to management of civil projects using tool Microsoft project.
Downloads
References
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
IOSR Journal of Mechanical and Civil Engineering (IOSRJMCE) e-ISSN: 2278-1684,p- SSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PP 57-63 www.iosrjournals.org
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 07 | July-2018 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
The CRIOCM 2006 International Symposium on “Advancement of Construction anagement and Real Estate” 384 ANT COLONY OPTIMIZATION ALGORITHM FOR RESOURCE LEVELING PROBLEM OF CONSTRUCTION PROJECT
Journal of Building Construction and Planning Research, 2015, 3, 221-232 Published Online December 2015 in http://www.scirp.org/journal/jbcprtp://dx.doi.org/10.4236/jbcpr.2015.34022
CONSTRUCTION SCHEDULING WITH ARTIFICIAL AGENTS AND THE ANT COLONY OPTIMIZATION METAHEURISTIC Symeon Christodoulou1 1 Department of Civil and Environmental Engineering, University of Cyprus, P.O. Box 20537, 1678 Nicosia, Cyprus.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0