Utilization of Management tool Microsoft Project in Highway Project
Keywords:
Highway Project, Analysis, Planning, Scheduling, Risk Analysis, Microsoft Project, Resource AllocationAbstract
Project management is the act of starting, arranging, executing, controlling, and shutting crafted by a group to accomplish explicit objectives and meet explicit achievement criteria at the predefined time. The essential test of project management is to accomplish the majority of the project objectives inside the given requirements. This data is normally depicted in project documentation, made toward the start of the improvement procedure. The essential imperatives are extension, time, quality and spending plan. In this study we are considering a case study of highway project i.e. devas Indore corridor 75 km long road of 4 lanes. Here we are comparing as per site working scheduling to a proposed scheduling in which we are preparing planning, lagging of activities and risk analysis using management tool Microsoft project 2013. Here we concluded that with the help of project management software like Microsoft project we can prepare a proper planning, can provide lagging, risk analysis and cost cutting of a construction project in a linear and simple way.
Downloads
References
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
IOSR Journal of Mechanical and Civil Engineering (IOSRJMCE) e-ISSN: 2278-1684,p- SSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PP 57-63 www.iosrjournals.org
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 07 | July-2018 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
The CRIOCM 2006 International Symposium on “Advancement of Construction anagement and Real Estate” 384 ANT COLONY OPTIMIZATION ALGORITHM FOR RESOURCE LEVELING PROBLEM OF CONSTRUCTION PROJECT
Journal of Building Construction and Planning Research, 2015, 3, 221-232 Published Online December 2015 in http://www.scirp.org/journal/jbcprtp://dx.doi.org/10.4236/jbcpr.2015.34022
CONSTRUCTION SCHEDULING WITH ARTIFICIAL AGENTS AND THE ANT COLONY OPTIMIZATION METAHEURISTIC Symeon Christodoulou1 1 Department of Civil and Environmental Engineering, University of Cyprus, P.O. Box 20537, 1678 Nicosia, Cyprus.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0