Efficient Construction by Implementation of Lean Management Principles
Keywords:
Lean, Construction, Management & ImplementationAbstract
This dissertation work was carried out on implementation of lean management principles in the construction industry with the focus on reducing wastes generated during the construction process and to increase the efficiency of resource utilization. Construction industry is one of the most unorganized, and complicated sectors. Also, this sector is financially dominated by use of material resources and workforce which makes it a highly complex and expensive sector. After identifying the issues concerning with this industry, the new technique is applied for increasing the efficiency and reducing the time consumption associated with this field. So, to achieve this goal, a method has been researched until that concept came which was already implemented successfully in the manufacturing sector. Then after brainstorming, that concept had been applied in construction industry which showed the potential of streamlining and the work processes. This leads to increase the output with comprehensive resource usage in the least possible time. In order to implement lean in construction, use the methodology of Value Stream Mapping because while doing this research work, we realized that this method unlike others, Essential features of lean construction includes a clear set of objects at project level. Lean construction helped us to practically visualize current state of the project and identify the wastes, which made it aqua clear to prepare a future state map with the evaluated results. In general lean construction project are easier to manage, safer, completed sooner, &less cost with better quality
Downloads
References
Fawaz A, Abdulmalek, Jayant Rajgopal, “Analyzing and benefits of Lean manufacturing and value stream mapping via simulation”,International Journal of Production Economics 107(1):223-236, 2007.
Frank and Lillan Gilbert,“Manufacturing & marketing of motion study” Business & Economic history 2nd series,vol 18th, 1989.
Bertelsen, S, “Lean construction: where are we and how to proceed Retrieved”,Lean construction journal, 2004.
Cullen, P.A., Butcher, B., Hickman, R., Keast, J., & Valadez, M, “The application of lean principles to in-service support comparison between construction and the aerospace and defence sectors” Lean construction journal, 2005.
T., Bozdogan, K., Cutcher, J. G., McManus, H., Nightingale, D., Rebentisch, E., Shields, T., Stahl, F., Walton, “Lean enterprise value: Insight from MIT’S lean aerospace initiative” ,the lean enterprise value foundation.INC, 2002.
Greg Howell and Glenn Ballard, “ Implementing Lean Construction: Understanding and Action”, the international group for lean construction, 1998.
O. Salem and E. Zimmer, “Application of Lean Manufacturing Principles to Construction” , Lean construction journal, 1555-1369,2005.
Yu, H., et al.,” Development of Lean Model for House Construction Using Value Stream Mapping” American Society of Civil Engineers, 1943-7862,2014.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0