Risk Analysis of a Construction Project Considering Seismic Hazards using Primavera A Review

Authors

  • Shivam Mishra P.G. Scholar, Department of Civil Engineering, Madhyanchal Professional University, Bhopal, Madhya Pradesh, India Author
  • M.P. Verma Associate Professor, Department of Civil Engineering, Madhyanchal Professional University, Bhopal, Madhya Pradesh, India Author

DOI:

https://doi.org/10.32628/IJSRCE

Keywords:

Primavera P6., Gantt Chart, Time-cost Comparison, Cpm Network, Resource Allocation, Project Scheduling, Seismic Hazard

Abstract

Implementation of construction project needs a proper planning and scheduling is of vital importance for the project to be executed and run smoothly. A best schedule has to be prepared in such a way that meets the primary objectives of the total project. Those essential destinations are to make a quality venture, finished on time, inside spending plan, and in a sheltered workplace. Consequently in this investigation a progressing development venture is taken and the execution of the undertaking is contrasted and the calendar with the assistance of Primavera. 
In this paper presenting review of literatures related to utilization of management tool
              

Downloads

Download data is not yet available.

References

Piyush Pramod Bagade and Prof. Abhijit Bhirud, “Review on construction project management software primavera p6” international journal of engineering sciences & research technology, ISSN: 2277-9655, January, 2018, PN (110-117).

Poonam Raykar and Ghadge A.N., “Analyzing the Critical Factors Influencing the Time Overrun and Cost Overrun in Construction Project” International Journal of Engineering Research, Volume No.5, ISSN:2319-6890, 9 Jan 2016, PN (21-25).

A. Ray Chaudhuri, B. Sivakonda Reddy and S.K. nimbal, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2017 PN (660 – 665)

A.R. Nikumbh and S.S. Pimpliker, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102).

P M Wale1 , N D. Jain , N R Godhani , S R Beniwal and A A Mir, «Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India», IOSR Journal of Mechanical and Civil Engineering, ISSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PN 57-63.

Shaik Mohammad, Kunal B. Badgujar, B.A.Konnur and Amarsinh B. Landage “A Review of EVM Analysis with Primavera”; International Journal of Engineering Research ISSN:23196890(online),2347-5013 Volume No.5, Issue Special 1 9 Jan 2014 PN: 164-167

Hamid, R. Gupta, Parag S. Mahatme and Taran C. Bhagat “The cost controlling and monitoring of Construction project through earned Value management system” International Journal of Advanced Technology in Engineering and Science www.ijates.com Volume No 03, Special Issue No. 01, March 2013 ISSN (online): 2348 – 7550

P. Dayakar and M.Udhayakumar, «Study on Project Management of an Ongoing Construction project Using MSP Sub Structure” Volume2 Issue 5 Number2–Oct 2012, PN 202-212.

Stephenson, P. and Fapohunda, J.A. “Optimal Construction Resources Utilization: Reflections of Site Managers’ Attributes. The Pacific Journal of Science and Technology, Vol. 11. No. 2. November 2010 (Fall) PN 105-109.

Tranner, D. S. Stephan Jabasingh and J. Jayalakshmi “Analysis of Cost Controlling In Construction Industries by Earned Value Method Using Primavera”; Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 6( Version 1), June 2009, PN.145-153.

Prabhakar, G. P. What is Project Success: A Literature Review. International Journal of Business and Management. September, 2008.

Kerzner, H. . Project Management: A Systems Approach to Planning, and Controlling. New Dehli. CBS Publishers and Distributors Pvt. Ltd. 2003.

Downloads

Published

15-09-2021

Issue

Section

Research Articles

How to Cite

Shivam Mishra, & M.P. Verma. (2021). Risk Analysis of a Construction Project Considering Seismic Hazards using Primavera A Review . International Journal of Scientific Research in Civil Engineering, 5(5), 64-68. https://doi.org/10.32628/IJSRCE

Similar Articles

1-10 of 343

You may also start an advanced similarity search for this article.