Analysis of A Project Cost Inflation Using Primavera Management Tool

Authors

  • Rahul Pandey Department of Civil Engineering, M.I.T.S BHOPAL, Madhya Pradesh, India Author
  • Afzal Khan Department of Civil Engineering, M.I.T.S BHOPAL, Madhya Pradesh, India Author

Keywords:

Cost Management, Cost Overrun, Primavera, Commercial, Time Period, Planning, Scheduling, Activity, Delay

Abstract

Project monitoring and control is that the tactic of collecting, recording, and reporting information concerning project performance. Project controlling uses the info from monitor activity to bring actual performance to planned performance. As cities continue to grow, the way we construct and manage buildings differ and the complexities keep tremendously increasing in the project. Planning and scheduling have become a major concept to be considered for a smooth execution of construction works. In order to reduce the complexities, an effective tool called Oracle’s Primavera P6 is used for determining an ideal schedule for construction activities. Construction planning is the necessary forerunner to scheduling and it includes determining general sequence, assigning responsibilities, defining construction methods and work tasks.

Downloads

Download data is not yet available.

References

Balakrishna Ch, Anand Goud K, Akula Prakash and Kandlagunta Mounika, [Schedule delay analysis of a multi-storied residential project using primavera], IOP Conf. Series: Materials Science and Engineering 1091 (2021).

Samrudhi Kashid and Sandeep. S. Chavan, [Critical analysis On Cost Management of Commercial Buildings by Using Primavera Software], International Journal for Research in Applied Science & Engineering Technology (IJRASET), Volume 10 Issue VII July 2022, ISSN: 2321-9653.

Kunal B Badgujar and B A Konnur, [EVM Analysis with Primavera], International Research Journal of Engineering and Technology (IRJET), Volume: 03 Issue: 06 | June-2016, ISSN: 2395-0072.

Chinmay Sunil Suryawanshi and Dr. R.P Singh Kushwah, [Planning and Scheduling of Multistoried Building Construction by Project Management Toll P6], International Research Journal of Modernization in Engineering Technology and Science, Volume:05/Issue:11/November-2023, ISSN: 2582-5208.

Nivya T and Anju k, [Risk Analysis and Project Management of Reconstructed Korappuzha bridge using Primavera P6], International Journal of Research in Engineering and Science (IJRES), Volume 9 Issue 7 ǁ 2021, ISSN: 2320-9356.

T.Subramani and P.Sivakumar, [Analysis Cost Overruns, Delays and Risk Involved in Construction Management Using Primavera], International Journal of Engineering & Technology, 7 (3.10) (2018) 160-163.

Suvarna P, Yateen Lokesh and Dr.S.P.Mahendra, [Planning, Scheduling and Tracking Of Ongoing Bridge Construction Project Using Primavera Software and EVM Technique], International Journal of Applied Engineering Research ISSN 0973-4562 Volume 13, Number 7 (2018) pp. 209-214.

Hitanshu Saini, Khushpreet Singh and Uma Malik, [Project Management in Construction Using Primavera], International Journal of Civil Engineering and Technology (IJCIET) Volume 8, Issue 8, August 2017, ISSN: 0976-6308.

Md Zeeshan Ali, Maneeth P.D, Brijbhushan S and Dr.Shreenivas Reddy Shahapur, [Analysis of Cost Estimation, Tracking and Earned Value Analysis of G+5 Apartment Building by Primavera P6], International Journal of Creative Research Thoughts (IJCRT), Volume 6, Issue 1 January 2018 | ISSN: 2320-2882.

Mohamed Abd El razek, Hosam El Din Hosny and Ahmed El Beheri, [Risk Factors in Construction Projects Cash- Flow Analysis], IJCSI International Journal of Computer Science Issues, Vol. 11, Issue 1, No 2, January 2014.

Dr.K.Divakar and Jebin Britto JD, [Factors Affecting Effective Implementation Of Cost Management Process In Construction Industry], International Research Journal of Engineering and Technology (IRJET), Volume: 05 Issue: 05 | May 2018, ISSN: 2395-0072.

Mohamed Mostafa Habib, Marwa Ahmed Kamer Eldawla and Mahmoud Ahmed Zaki, [A risk management model for large projects in the construction phase in Egypt], Journal of Project Management 8 (2023) 25–36.

Downloads

Published

24-03-2024

Issue

Section

Research Articles

How to Cite

Pandey, R., & Khan, Mr. Jonathan R, Mr. Samrudh D Yash, Mr. Lenin E, Mr. K Rehan, A. (2024). Analysis of A Project Cost Inflation Using Primavera Management Tool. International Journal of Scientific Research in Civil Engineering, 8(2), 81-90. https://ijsrce.com/index.php/home/article/view/IJSRCE248211

Similar Articles

1-10 of 292

You may also start an advanced similarity search for this article.