A Review on Port Mann Bridge
Keywords:
Port Mann bridge, metropolitan city, cable stayed bridgeAbstract
This paper shows that, it carries 10 lanes of traffic with space reserved for a light rail line. In order to connect Coquitlam and Surrey in British Columbia, a steel arch bridge that crossed the Fraser River and was part of the Vancouver metropolitan region, was replaced by a cable-stayed bridge. The previous bridge was destroyed through reverse construction, a procedure that took three years to complete, after its replacement was made accessible to traffic. At 2 km long and featuring a 470-m-long main span and 52-m-wide deck, the Port Mann Bridge is currently the second longest cable-stayed bridge in North America and one of the widest bridges in the world.
Downloads
References
News Staff (September 18, 2012). "Three eastbound lanes open on new Port Mann Bridge". CityNews. CityNews. Retrieved December 2, 2022.
Nagel, Jeff (September 5, 2012). "Sept. 18 set for first crossings of new Port Mann". Peace Arch News. Peace Arch News. Retrieved December 2, 2022.
Luba, Frank (November 13, 2012). "Drivers switch to new Port Mann Bridge as of this Saturday". Wilderness Committee. Wilderness Committee. Retrieved December 2, 2022.
British Columbia Office of the Premier (December 1, 2012). "New Port Mann Bridge opens to eight lanes of traffic". British Columbia Government News. Government of British Columbia. Retrieved December 2, 2022.
"Facts & Trivia". Pmh1project.com. Archived from the original on September 17, 2012. Retrieved December 7, 2012.
British Columbia Department of Highways (1961). Minister of Highways Report for the Fiscal Year 1959/60 (Report). Victoria: Government of British Columbia. pp. 48 (F48), 49 (F49).
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0