Impact of Inflation Rate on Construction Project A Review
Keywords:
project management, scheduling, inflation rate, costing, monitoringAbstract
Construction of high-rise structures was initiated in complex and dynamic problems resulting in circumstances of high uncertainty and risk, which were compounded by demanding many constraints. The occurrence of risk accidents in the phase of multi-storey construction will lead to great losses to the proprietor and construction enterprises if the construction risk of the structure has not been paid more attention to. The worst catastrophic may occur during structural construction is collapse of permanent or temporary construction. If risk management is not considered in bridge construction projects, there is chance for unwanted problems and uncertainties, by these risks objective cannot be achieved on time, within budget, or with suitable quality results.
In this paper presenting review of past publications and researches.
Downloads
References
Muhamad Rizki Aditya, Ika Bali and Manlian Ronald A. Simanjuntak, [An Analysis of Upper Structural System Work Cost Management Factors at Cimanuk Bridge Project at Majalengka, West Java], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 7, Issue 5, May 2018.
Y. Suponco Wisnu Broto, Tri Joko Wahyu Adi, Erma Suryani and Jojok Widodo Soetjipto, [Project Cost Escalation Prediction Models Based on System Dynamics Approach], The Third International Conference on Civil Engineering Research (ICCER) August 1st-2nd 2017, Surabaya – Indonesia.
Elkhider B. E. Mohamed and Salma Y. M. Mahmoud, [An Assessment of the Impact of Inflation on the Prices of Selected Construction Materials in Sudan], International Journal of Multidisciplinary Research and Publications, Volume 2, Issue 12, pp. 41-44, 2020.
Wondimagegn Tadesse Borku and EssubalewTarkuYenialem, [Assessing The Impact Of Cost Inflation On Building Construction Material: A Study In Wolaita Zone, Southern Ethiopia], Journal of University of Shanghai for Science and Technology ISSN: 1007-6735, Volume 24, Issue 1, January - 2022.
Kamyar Kabirifar and Mohammad Mojtahedi, [The impact of Engineering, Procurement and Construction (EPC) Phases on Project Performance: A Case of Large-scale Residential Construction Project], Buildings 2019, 9, 15; doi:10.3390/buildings9010015.
Abdel Hamid.H.M.Ali, Tareg Abdalla, Awwal Al Haqq, Adam Umar, Ismail Hassan Mouhoumed and Ibrahim Abhi Razak Mohmed, [COST AND TIME CONTROL IN CONSTRUCTION PROJECTS: A CASE STUDY OF KHARTOUM STATE], Journal of Jilin University (Engineering and Technology Edition), ISSN?1671-5497, Vol: 41 Issue: 11-2022.
A M Faten Albtoush, S I Doh, Abdul Rahimi Bin Abdul Rahman and Ja'far A.Aldiabat Albtoush, [FACTORS EFFECTING THE COST MANAGEMENT IN CONSTRUCTION PROJECTS], International Journal of Civil Engineering and Technology (IJCIET) Volume 11, Issue 1, January 2020, pp. 105-111.
Mohamed Abd El razek, Hosam El Din Hosny and Ahmed El Beheri, [RISK FACTORS IN CONSTRUCTION PROJECTS CASH-FLOW ANALYSIS], IJCSI International Journal of Computer Science Issues, Vol. 11, Issue 1, No 2, January 2014.
Avinash R. Yadav and R. M. Swamy, [EFFECTS OF PROJECT COST ANALYSIS AND FACTORS AFFECTING INFLATION], International Research Journal of Engineering and Technology (IRJET), Volume: 06 Issue: 02 | Feb 2019.
Nafeesa Minnath M. T and Anupama Natesh, [EFFECTIVE TIME AND COST MANAGEMENT TECHNIQUES IN CONSTRUCTION OF A COMMERCIAL BUILDING USING PRIMAVERA], International Research Journal of Engineering and Technology (IRJET), Volume: 08 Issue: 09 | Sep 2021.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0