Scheduling and Monitoring of Water Supply Project at Jabalpur using Management Tool Primavera : A Review
Keywords:
Primavera, Gantt Chart, Time-Cost Comparison, Cpm Network, Tracking, Project SchedulingAbstract
Implementation of construction project needs a proper planning and scheduling is of vital importance for the project to be executed and run smoothly. A best schedule has to be prepared in such a way that meets the primary objectives of the total project. Those primary objectives are to create a quality project, completed on time, within budget, and in a safe work environment. IN this paper presenting review of literature related to monitoring controlling of a water supply project.
Downloads
References
Kavita Dehalwar and Dr. Jagdish Singh, [Challenges And Strategies For The Improvement Of Water Management In Bhopal], European Scientific Journal January 2016 edition vol.12, No.2 ISSN: 1857 – 7881 (Print) e - ISSN 1857- 7431.
Akhil Gupta and Dr. Sanjay Tiwari, [Resource Allocation with Primavera-P6 Software], International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653, Volume 8 Issue X Oct 2020.
Shivanjali Giram, Rashmi Sabale, Abhishek Bhad and Vijay Wani, [ASSESSMENT OF RESOURCE MANAGEMENT BY USING PRIMAVERA SOFTWARE], Open Access International Journal of Science and Engineering, Volume 6 Issue 7 July 2021.
Sudarshan. S and Geena George, [COMPARISON OF PROJECT PLANNING & SCHEDULING SOFTWARE PRIMAVERA AND MICROSOFT PROJECT USED IN THE CONSTRUCTION INDUSTRY], International Journal of Engineering Technologies and Management Research, September 2021 8(9), 78-87.
Kottamasu L. N. Panakala Rao and K. Shyam Chamberlin, [Resources Optimization in Construction of a Residential Apartment by using Primavera: a Case Study], International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019.
Roma Silawat and Rajendra Chauhan, [ANALYSIS OF WATER QUALITY OF RIVER KALIYASOT BHOPAL, (M.P.) INDIA.], Journal of Science and Technological Researches (JSTR), Vol. 3 Issue No.1, January-March 2021.
Divya V S and C Gayathri, [Flexible Scheduling in Construction Industry by Using Primavera], International Journal for Modern Trends in Science and Technology ISSN: 2455-3778, Volume: 06, Issue No: 04, April 2020.
Satinder Chopra and Arvind Dewangan, [Developing an Efficient Schedule in Primavera P6: Significance of Activity ID & Descriptions], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 3, Issue 7, July 2014.
Divya.D.S and Sahaya Nisha.J, [Flexible Scheduling in Construction Industry by Using Primavera and Histogram], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 8, Issue 3, March 2019.
Hassan ElFiky, Aly Owida and Noha M. Galal, [Resource Constrained Multi-Project Scheduling Using Priority Rules: Application in the Deep-Water Construction Industry], Proceedings of the International Conference on Industrial Engineering and Operations Management Dubai, UAE, March 10-12, 2020.
Patil C B and Arun Kumar C J, [Planning, Scheduling, and Optimization of Labor Resources in the construction of Residential Apartment using Primavera P6 software], International Research Journal of Engineering and Technology (IRJET), Volume: 06 Issue: 07 | July 2019.
Archana Sen, Namita Sen and Vineesha Singh, [Issues and Challenges of Water Supply System in Bhopal City, Madhya Pradesh], Bulletin of Pure and Applied Sciences. Geology (Geological Science), Vol.41F, No.1, January-June 2022: P.129-141.
Shanghong Zhang, Jiasheng Yang, Zhongyu Wan and Yujun Yi, [Multi-Water Source Joint Scheduling Model Using a Refined Water Supply Network: Case Study of Tianjin], Water 2018, 10, 1580.
Aman Gaur, Shashank Chourey, Deepa Madathil and A. N. Brijesh Nair, [QUALITY ANALYSIS OF DRINKING WATER IN BHOPAL CITY], IJRET: International Journal of Research in Engineering and Technology, Volume: 03 Issue: 10 | Oct-2014.
Hylton Olivieria, Olli Seppänena and Ariovaldo Denis Granjab, [Improving workflow and resource usage in construction schedules through location-based management system (LBMS)], Construction Management and Economics, 2018 VOL. 36, NO. 2, 109–124.
Downloads
Published
Issue
Section
License

This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0