Tracking and Scheduling of a Building Project Using Management Tool : A Review
DOI:
https://doi.org/10.32628/IJSRCEKeywords:
Nonlinear Static Analysis, Deflection Cooling Tower, Analysis, Thermal, Displacement, Forces, MomentAbstract
Project management is the practice of initiating, planning, executing, controlling, and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time. The primary challenge of project management is to achieve all of the project goals within the given constraints. This information is usually described in project documentation, created at the beginning of the development process. The primary constraints are scope, time, quality and budget. The secondary – and more ambitious – challenge is to optimize the allocation of necessary inputs and apply them to meet pre-defined objectives. In this paper we are elaborating review of lieratures related to management of construction project.
Downloads
References
Piyush Pramod Bagade and Prof. Abhijit Bhirud, “Review on construction project management software primavera p6” international journal of engineering sciences & research technology, ISSN: 2277-9655, January, 2018, PN (110-117).
Poonam Raykar and Ghadge A.N., “Analyzing the Critical Factors Influencing the Time Overrun and Cost Overrun in Construction Project” International Journal of Engineering Research, Volume No.5, ISSN:2319-6890, 9 Jan 2016, PN (21-25).
A. Ray Chaudhuri, B. Sivakonda Reddy and S.K. nimbal, “Resource Management in Construction Projects – a case study” Engineering Science and Technology: An International Journal (ESTIJ), ISSN: 2250-3498, Vol.2, No. 4, August 2017 PN (660 – 665)
A.R. Nikumbh and S.S. Pimpliker, “Planning and controlling of a National Highway Project- A case study”, Journal of the Indian Road Congress Paper No.613, April – June 2014 PN (91 – 102).
P M Wale1 , N D. Jain , N R Godhani , S R Beniwal and A A Mir, «Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India», IOSR Journal of Mechanical and Civil Engineering, ISSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PN 57-63.
Shaik Mohammad, Kunal B. Badgujar, B.A.Konnur and Amarsinh B. Landage “A Review of EVM Analysis with Primavera”; International Journal of Engineering Research ISSN:23196890(online),2347-5013 Volume No.5, Issue Special 1 9 Jan 2014 PN: 164-167
Hamid, R. Gupta, Parag S. Mahatme and Taran C. Bhagat “The cost controlling and monitoring of Construction project through earned Value management system” International Journal of Advanced Technology in Engineering and Science www.ijates.com Volume No 03, Special Issue No. 01, March 2013 ISSN (online): 2348 – 7550
P.Dayakar and M.Udhayakumar, «Study on Project Management of an Ongoing Construction project Using MSP Sub Structure” Volume2 Issue 5 Number2–Oct 2012, PN 202-212.
Stephenson, P. and Fapohunda, J.A. “Optimal Construction Resources Utilization: Reflections of Site Managers’ Attributes. The Pacific Journal of Science and Technology, Vol. 11. No. 2. November 2010 (Fall) PN 105-109.
Tranner, D. S. Stephan Jabasingh and J. Jayalakshmi “Analysis of Cost Controlling In Construction Industries by Earned Value Method Using Primavera”; Int. Journal of Engineering Research and Applications www.ijera.com ISSN : 2248-9622, Vol. 4, Issue 6( Version 1), June 2009, PN.145-153.
Prabhakar, G. P. What is Project Success: A Literature Review. International Journal of Business and Management. September, 2008.
Kerzner, H. . Project Management: A Systems Approach to Planning, and Controlling. New Dehli. CBS Publishers and Distributors Pvt. Ltd. 2003.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution 4.0 International License.
https://creativecommons.org/licenses/by/4.0