A Review on Kanban System

Authors(2) :-Prabal Sharma, Rinkey Sahu

A successful implementation of kanban system have been done in the production system, in search of the ideal results of it, whole setup was done at a leading TMT manufacturing unit, A pull nature of kanban have been established and then the data is collected first, before that proper training is given to the workers of the organization, and keeping in mind all the necessary before implementation like 5s just in time and lean manufacturing concepts, after that 3 sets of data has been taken after the implementation of the kanban process, taking all the factors viz replenishment factor, buffer stock etc after that calculation has done and the optimum results have been achieved, the required results are then compared with the old data which was taken before the implementation of kanban, Results have been bifurcated in terms of Time , increase in Production and Increase in profit as well as cost savings.

Authors and Affiliations

Prabal Sharma
Department of Mechanical Engineering, G D Rungta college of Engineering & technology, Kohka, Bhilai, Madhya Pradesh, India
Rinkey Sahu
Assistant Professor, Department of Mechanical Engineering, G D Rungta college of Engineering & technology, Kohka, Bhilai, Madhya Pradesh, India

Kanban, TMT, 5s, Just in time, Replenishment, Buffer stock,

  1. “AIDT- Just in time manufacturing” September 11,2006. American Society for Quality Control (ASQC).
  2. “A Guide to the Project Management Body of Knowledge”, 4th ed. Pennsylvania, USA: Project Management Institute, Inc., 2008.
  3. “Applying the Kaizen Method and the 5S Technique in the Activity of Post-Sale Services in the Knowledge-Based Organization”,proceedings of the international multi conference of engineers & computer scientists 2010 vol3,IMECS2010,march 17-19,2010,Hong Kong.
  4. “Basic concepts of Lean Manufacturing” Marek Piatkowski - F.S.P. Consulting Inc. Toronto,Canada,1994,Phone: 416-235-2631, e-Mail: Marek.Piatkowski@rogers.com,THE PRODUCTION SYSTEM DOCTOR’ S OF F ICE - WWW.TWINETWORK.COM.
  5. “Implementing World Class Manufacturing”, Rubrich, L. & Watson, M. (1998), Fort Wayne, IN: WCM Associates.
  6. "Japanese Manufacturing Techniques”, Schonberger, R.J. (1982), New York, NY: The Free Press.

Publication Details

Published in : Volume 4 | Issue 6 | November-December 2020
Date of Publication : 2020-12-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 102-105
Manuscript Number : IJSRCE204617
Publisher : Technoscience Academy

ISSN : 2456-6667

Cite This Article :

Prabal Sharma, Rinkey Sahu, "A Review on Kanban System", International Journal of Scientific Research in Civil Engineering (IJSRCE), ISSN : 2456-6667, Volume 4, Issue 6, pp.102-105, November-December.2020
URL : https://ijsrce.com/IJSRCE204617

Article Preview

Contact Us

  • Address : 3 & 4, Sterling Plaza, Indira Circle, 150 Feet Ring Road, Rajkot-360005, Gujarat, India