A Review on Kanban System

Authors

  • Prabal Sharma Department of Mechanical Engineering, G D Rungta college of Engineering & technology, Kohka, Bhilai, Madhya Pradesh, India Author
  • Rinkey Sahu Assistant Professor, Department of Mechanical Engineering, G D Rungta college of Engineering & technology, Kohka, Bhilai, Madhya Pradesh, India Author

DOI:

https://doi.org/10.32628/IJSRCE

Keywords:

Kanban, TMT, 5s, Just In Time, Replenishment, Buffer Stock

Abstract

A successful implementation of kanban system have been done in the production system, in search of the ideal results of it, whole setup was done at a leading TMT manufacturing unit, A pull nature of kanban have been established  and then the data is collected first, before that proper training is given to the workers of the organization, and keeping in mind all the necessary before implementation like 5s just in time and lean manufacturing concepts, after that 3 sets of data has been taken after the implementation of the kanban process, taking all the factors viz replenishment  factor, buffer stock etc after that calculation has done and the optimum results have been achieved, the required results are then compared with the old data which was taken before the implementation of kanban, Results have been bifurcated in terms of Time , increase in Production and Increase in profit as well as cost savings.              

Downloads

Download data is not yet available.

References

“AIDT- Just in time manufacturing” September 11,2006. American Society for Quality Control (ASQC).

“A Guide to the Project Management Body of Knowledge”, 4th ed. Pennsylvania, USA: Project Management Institute, Inc., 2008.

“Applying the Kaizen Method and the 5S Technique in the Activity of Post-Sale Services in the Knowledge-Based Organization”,proceedings of the international multi conference of engineers & computer scientists 2010 vol3,IMECS2010,march 17-19,2010,Hong Kong.

“Basic concepts of Lean Manufacturing” Marek Piatkowski - F.S.P. Consulting Inc. Toronto,Canada,1994,Phone: 416-235-2631, e-Mail: [email protected],THE PRODUCTION SYSTEM DOCTOR’ S OF F ICE - WWW.TWINETWORK.COM.

“Implementing World Class Manufacturing”, Rubrich, L. & Watson, M. (1998), Fort Wayne, IN: WCM Associates.

"Japanese Manufacturing Techniques”, Schonberger, R.J. (1982), New York, NY: The Free Press.

Downloads

Published

10-12-2020

Issue

Section

Research Articles

How to Cite

Sharma, P., & Sahu, R. (2020). A Review on Kanban System . International Journal of Scientific Research in Civil Engineering, 4(6), 102-105. https://doi.org/10.32628/IJSRCE