Planning, Scheduling and Resource Allocation of a Nh-344 Using Primavera P6 A Review

Authors(2) :-Manmeet Anand, Afzal Khan

Transportation is one of biggest basic need for the society. The construction of road gives the better transportation facility around the country. For better development of the country in the construction assertive, the project management is necessary. Time and Cost are the two basic parameters to control work in the execution of the road construction. Flow of cost and its usage is very important aspect for beneficial point of view. It is necessary to develop the planning software to easy the works and risks arises in the projects. For the cost analysis of the road works, EVA technique is used to overcome the problems raised during execution. To understand the cost values in the road construction projects, Earned value analysis of any construction industry which gives the warning messages to the planning process as well as during the execution of the project whether the project is going on time and it is under budget or over budget. Primavera P6 software gives the accurate Earned value results. In this paper presenting review of literatures and publications related to scheduling of projects in construction industry.

Authors and Affiliations

Manmeet Anand
P.G. Scholar, Department of Civil Engineering, Millennium Institute of Technology, Bhopal Madhya Pradesh, India
Afzal Khan
Assistant Professor, Department of Civil Engineering, Millennium Institute of Technology, Bhopal Madhya Pradesh, India

Earned Value Analysis, Primavera P6, Project Management, Road Work, Cost, Time, EVA Parameters, Resources, Scheduling.

  1. R.Santhosh Kumar and Anoop James Antony, [Experimental Investigation on Pre Planning of Road Construction by Using Primavera], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 7, Issue 5, May 2018.
  2. Gunjal Kartikeyan, Rohit Gholap, Ranjeet Katkar, Prasad Khune and Pooja Bhosale, [TO STUDY ADVANCED PROJECT PLANNING AND SCHEDULING-CASE STUDY], INTERNATIONAL JOURNAL OF ADVANCE SCIENTIFIC RESEARCH & ENGINEERING TRENDS, || Volume 5 || Issue 12 || April 2021.
  3. Maheshwar S Maregoudru, Monish Kumar K, Ashwija K C and Sparsha B P, [Cost Analysis of Road Construction Project by Earned Value Analysis using Primavera P6], International Research Journal of Engineering and Technology (IRJET), Volume: 04 Issue: 07 | July -2017.
  4. Pravin Namdev Pharne, Nagesh Rajshekhar Wagdare, Nilesh Pratap Limbone, Jivan Dinkar Gaikwad, [Project Management Using Primavera P6], International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653, Volume 10 Issue V May 2022.
  5. T.Subramani and M.Sekar, [Preplanning And Scheduling Of Road Construction By Using PPM], International Journal of Application or Innovation in Engineering & Management (IJAIEM), Volume 4, Issue 5, May 2015 ISSN 2319 - 4847.
  6. T.Subramani and Kurian Jacob, [Analysis of Risk, Threshold And Issues And Monitoring Schedule Of Building Construction Using PPM Software], International Journal of Emerging Trends & Technology in Computer Science (IJETTCS), Volume 5, Issue 3, May-June 2016 ISSN 2278-6856.
  7. Sushma.H, Bhavya.S, Rajeeva S.J and G. Narayan, [Planning, Scheduling and Resource Optimization for Road Construction Using Primavera], INTERNATIONAL JOURNAL OF INNOVATIVE RESEARCH IN TECHNOLOGY,  August 2017 | IJIRT | Volume 4 Issue 3 | ISSN: 2349-6002.
  8. Lalitesh Sinha and Atul Tripathi, [Cost and Time Optimization of Highway (NH 24-B, Phase-I) Construction], Volume 4, Issue 7, July – 2019 International Journal of Innovative Science and Research Technology ISSN No:-2456-2165.

Publication Details

Published in : Volume 7 | Issue 2 | March-April 2023
Date of Publication : 2023-03-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 01-07
Manuscript Number : IJSRCE23721
Publisher : Technoscience Academy

ISSN : 2456-6667

Cite This Article :

Manmeet Anand, Afzal Khan, "Planning, Scheduling and Resource Allocation of a Nh-344 Using Primavera P6 A Review", International Journal of Scientific Research in Civil Engineering (IJSRCE), ISSN : 2456-6667, Volume 7, Issue 2, pp.01-07, March-April.2023
URL : https://ijsrce.com/IJSRCE23721

Article Preview

Region Based Segmentation COVID- 19 Chest X-Ray Images using Color Thresholding

Authors(2) :-Ei Ei Khaing, Thu Zar Aung

Authors and Affiliations

Ei Ei Khaing

Thu Zar Aung

Publication Details

Published in : Volume 7 | Issue 2 | March-April 2023
Date of Publication : 2023-04-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) :
Manuscript Number : IJSRCE23721
Publisher : Technoscience Academy

ISSN : 2456-6667

Cite This Article :

Ei Ei Khaing, Thu Zar Aung, "Region Based Segmentation COVID- 19 Chest X-Ray Images using Color Thresholding", International Journal of Scientific Research in Civil Engineering (IJSRCE), ISSN : 2456-6667, Volume 7, Issue 2, pp., March-April.2023
URL : https://ijsrce.com/IJSRCE23721

Article Preview

Contact Us

  • Address : 3 & 4, Sterling Plaza, Indira Circle, 150 Feet Ring Road, Rajkot-360005, Gujarat, India