Project Monitoring and Scheduling of Water Supply Project Using Primavera P6

Authors(2) :-Ravi Patel, Anudeep Nema

Water is of fundamental importance for human life and plays an important role in many biological and chemical systems. Only 0.3% of the water resources in the world are usable.Scarcity of water has become widespread all over the world. Current methods for water scarcity assessment are mainly based on water quantity and seldom consider water quality. Population growth and urban development aspect dramatically alter natural watershed ecosystem structure and functions and stress water resources. The demand of time is review water quantity and water quality issues, as well as water supply challenges in an urban environment.So that more than a billion people in the developing world lack safe drinking water. About three billion people live without access to adequate sanitation systems necessary for reducing exposure to water-related diseases.Water is a valuable fundamental asset for life. Availability of sufficient water resource in any region effects socio economic development as well as better quality of life. Lack of water resource is determinant the poor quality of life. This research is based on secondary as well as primary data. This investigation highlighted the status of water resource and supply system in the Bhopal city and investigation of scheduling and resource allocation of water supply using Primavera p6. This research find out the spatial and temporal distribution of water supply system via narmada water supply as well as quality and quantity. Research also analysis the issues and challenges about water resource and satisfaction level of Bhopal city.

Authors and Affiliations

Ravi Patel
P.G. Scholar, Department of Civil Engineering, Eklavya University Damoh, Madhya Pradesh, India Associate Professor, Department of Civil Engineering, Eklavya University Damoh, Madhya Pradesh, India
Anudeep Nema

Water Resource, Supply, Quality, Quantity, Satisfaction level, Primavera p6

  1. Kavita Dehalwar and Dr. Jagdish Singh, [Challenges And Strategies For The Improvement Of Water Management In Bhopal], European Scientific Journal January 2016 edition vol.12, No.2 ISSN: 1857 – 7881 (Print) e - ISSN 1857- 7431.
  2. Akhil Gupta and Dr. Sanjay Tiwari, [Resource Allocation with Primavera-P6 Software], International Journal for Research in Applied Science & Engineering Technology (IJRASET) ISSN: 2321-9653, Volume 8 Issue X Oct 2020.
  3. Shivanjali Giram, Rashmi Sabale, Abhishek Bhad and Vijay Wani, [ASSESSMENT OF RESOURCE MANAGEMENT BY USING PRIMAVERA SOFTWARE], Open Access International Journal of Science and Engineering, Volume 6 Issue 7 July 2021.
  4. Sudarshan. S and Geena George, [COMPARISON OF PROJECT PLANNING & SCHEDULING SOFTWARE PRIMAVERA AND MICROSOFT PROJECT USED IN THE CONSTRUCTION INDUSTRY], International Journal of Engineering Technologies and Management Research, September 2021 8(9), 78-87.
  5. Kottamasu L. N. Panakala Rao and K. Shyam Chamberlin, [Resources Optimization in Construction of a Residential Apartment by using Primavera: a Case Study], International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Volume-7, Issue-6C2, April 2019.
  6. Roma Silawat and Rajendra Chauhan, [ANALYSIS OF WATER QUALITY OF RIVER KALIYASOT BHOPAL, (M.P.) INDIA.], Journal of Science and Technological Researches (JSTR), Vol. 3 Issue No.1,  January-March 2021.
  7. Divya V S and C Gayathri, [Flexible Scheduling in Construction Industry by Using Primavera], International Journal for Modern Trends in Science and Technology ISSN: 2455-3778, Volume: 06, Issue No: 04, April 2020.
  8. Satinder Chopra and Arvind Dewangan, [Developing an Efficient Schedule in Primavera P6: Significance of Activity ID & Descriptions], International Journal of Innovative Research in Science, Engineering and Technology, Vol. 3, Issue 7, July 2014.

Publication Details

Published in : Volume 7 | Issue 1 | January-February 2023
Date of Publication : 2023-01-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 60-71
Manuscript Number : IJSRCE22718
Publisher : Technoscience Academy

ISSN : 2456-6667

Cite This Article :

Ravi Patel, Anudeep Nema, "Project Monitoring and Scheduling of Water Supply Project Using Primavera P6", International Journal of Scientific Research in Civil Engineering (IJSRCE), ISSN : 2456-6667, Volume 7, Issue 1, pp.60-71, January-February.2023
URL : https://ijsrce.com/IJSRCE22718

Article Preview

Contact Us

  • Address : 3 & 4, Sterling Plaza, Indira Circle, 150 Feet Ring Road, Rajkot-360005, Gujarat, India