Implementation of Kanban System in Manufacturing Process

Authors(2) :-Prabal Sharma, Rinkey Sahu

A successful implementation of kanban system have been done in the production system, in search of the ideal results of it, whole setup was done at a leading TMT manufacturing unit, A pull nature of kanban have been established and then the data is collected first, before that proper training is given to the workers of the organization, and keeping in mind all the necessary before implementation like 5s just in time and lean manufacturing concepts, after that 3 sets of data has been taken after the implementation of the kanban process, taking all the factors viz replenishment factor, buffer stock etc after that calculation has done and the optimum results have been achieved, the required results are then compared with the old data which was taken before the implementation of kanban, Results have been bifurcated in terms of Time , increase in Production and Increase in profit as well as cost savings.

Authors and Affiliations

Prabal Sharma
Department of Mechanical Engineering, G D Rungta college of Engineering & technology, Kohka, Bhilai, Madhya Pradesh, India
Rinkey Sahu
Assistant Professor, Department of Mechanical Engineering, G D Rungta college of Engineering & technology, Kohka, Bhilai, Madhya Pradesh, India

Kanban, Replenishment, Process Parameter

  1. “Implementation of Kanban system for inventory management for assembly line”, by Kalpesh V bhagat, Sharad V Gaikwad, Mangesh Ashtekar, NCRTME-2018
  2. “Overview of Kanban Methodology and its implementation” by Rajat B Wakode, Laukik P Raut, Pravin Talmale Vol-3, Issue No-2, IJSRD-2015.
  3. “Optimization approach of Vehicle Routing by a Milk-Run material suppy system” by Dipesh kumar patel, Dr M.B patel , Vol-1, Issue No-6, IJSRD-2013
  4. “AIDT- Just in time manufacturing” September 11,2006. American Society for Quality Control (ASQC).
  5. “A Guide to the Project Management Body of Knowledge”, 4th ed. Pennsylvania, USA: Project Management Institute, Inc., 2008.
  6. “Applying the Kaizen Method and the 5S Technique in the Activity of Post-Sale Services in the Knowledge-Based Organization”,proceedings of the international multi conference of engineers & computer scientists 2010 vol3,IMECS2010,march 17-19,2010,Hong Kong.
  7. “Basic concepts of Lean Manufacturing” Marek Piatkowski - F.S.P. Consulting Inc. Toronto,Canada,1994,
  8. “Implementing World Class Manufacturing”, Rubrich, L. & Watson, M. (1998), Fort Wayne, IN: WCM Associates.
  9. “Japanese Manufacturing Techniques”, Schonberger, R.J. (1982), New York, NY: The Free Press.
  10. “Just-In-Time: Alive and Well in the Sout” by Dr. Anthony Inman.
  11. “Kanban made simple” by John M. Gross.
  12. “Leadership and project management: Time for a shift from fayol to flores,” G. A. Howell, H. Macomber, L. Koskela, and J. Draper, in Proceedings of the 12th Annual Conference of the International Group for Lean Construction (IGLC-12), August 2004, pp. 22–29.
  13. “Operations Management: Strategy and Analysis”, Chapter 11 - Krajewski & Ritzman Seventh Edition © 2004 Prentice Hall, Inc.
  14. “Review on just in time techniques in manufacturing systems “Agrawal N., Manufacturing process & automation department,Netaji subhash Chandra bose institute of technology, New delhi-110078, APEM journal, 2010, ISSN 1854-6250.

Publication Details

Published in : Volume 4 | Issue 6 | November-December 2020
Date of Publication : 2020-12-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 106-110
Manuscript Number : IJSRCE204618
Publisher : Technoscience Academy

ISSN : 2456-6667

Cite This Article :

Prabal Sharma, Rinkey Sahu, "Implementation of Kanban System in Manufacturing Process", International Journal of Scientific Research in Civil Engineering (IJSRCE), ISSN : 2456-6667, Volume 4, Issue 6, pp.106-110, November-December.2020
URL : https://ijsrce.com/IJSRCE204618

Article Preview

Contact Us

  • Address : 3 & 4, Sterling Plaza, Indira Circle, 150 Feet Ring Road, Rajkot-360005, Gujarat, India