Utilization of management tool Microsoft project in construction Industry : A Review

Authors(2) :-Vishwanath Bhatele, Ajeet Saxena

Project management incorporates the way toward arranging, organizing, overseeing assets and methods to accomplish the hierarchical objectives. Objectives are set and accomplished in the project management and it's tied in with handling and controlling. Project management is about the arranging and controlling how the hierarchical objectives are met. Much the same as the business administrators who oversee a particular business zone, project supervisors administer the general project allotted to them and control cost and generation matters inside enterprises. Microsoft project is an easy and simple management tool which provide fast and specific procedure for management and scheduling of a project. Civil industry utilizes such tools for proper and easy management of various project. Programming building is worried about the improvement and headway of immense and different programming serious frameworks. It covers hypotheses, techniques and devices for the particular, engineering, structure, testing, and support of programming frameworks. The present improvement of programming frameworks are altogether huge, intricate and basic, that just through the utilization of computerized methodologies can such frameworks be created and advance in a monetary and opportune way. In this paper we are providing review of research done in past related to management of civil projects using tool Microsoft project.

Authors and Affiliations

Vishwanath Bhatele
P. G. Scholar Department of Civil Engineering, Bhopal, R.E.C., Bhopal, Madhya Pradesh, India
Ajeet Saxena
Assistant Professor, Department of Civil Engineering, Bhopal, R.E.C., Bhopal, Madhya Pradesh, India

Project Management, Microsoft Project, Review, Scheduling, Civil Industry.

  1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
  2. IOSR Journal of Mechanical and Civil Engineering (IOSRJMCE) e-ISSN: 2278-1684,p- SSN: 2320-334X, Volume 12, Issue 3 Ver. III (May. - Jun. 2015), PP 57-63 www.iosrjournals.org
  3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 04 | Apr-2018 www.irjet.net p-ISSN: 2395-0072
  4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 07 | July-2018 www.irjet.net p-ISSN: 2395-0072
  5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 04 Issue: 07 | July -2017 www.irjet.net p-ISSN: 2395-0072
  6. The CRIOCM 2006 International Symposium on “Advancement of Construction anagement and Real Estate” 384 ANT COLONY OPTIMIZATION ALGORITHM FOR RESOURCE LEVELING PROBLEM OF CONSTRUCTION PROJECT
  7. Journal of Building Construction and Planning Research, 2015, 3, 221-232 Published Online December 2015 in http://www.scirp.org/journal/jbcprtp://dx.doi.org/10.4236/jbcpr.2015.34022
  8. CONSTRUCTION SCHEDULING WITH ARTIFICIAL AGENTS AND THE ANT COLONY OPTIMIZATION METAHEURISTIC Symeon Christodoulou1 1 Department of Civil and Environmental Engineering, University of Cyprus, P.O. Box 20537, 1678 Nicosia, Cyprus.

Publication Details

Published in : Volume 3 | Issue 6 | November-December 2019
Date of Publication : 2019-12-30
License:  This work is licensed under a Creative Commons Attribution 4.0 International License.
Page(s) : 98-101
Manuscript Number : IJSRCE193614
Publisher : Technoscience Academy

ISSN : 2456-6667

Cite This Article :

Vishwanath Bhatele, Ajeet Saxena, "Utilization of management tool Microsoft project in construction Industry : A Review", International Journal of Scientific Research in Civil Engineering (IJSRCE), ISSN : 2456-6667, Volume 3, Issue 6, pp.98-101, November-December.2019
URL : https://ijsrce.com/IJSRCE193614

Article Preview

Contact Us

  • Address : 3 & 4, Sterling Plaza, Indira Circle, 150 Feet Ring Road, Rajkot-360005, Gujarat, India